Q: Cynergy intends to respond
A: Thanks for your interest.
Q: Will the Ruckus ICX 7150 and 7250 Switches require any design/engineering services?
Will the Ruckus ICX 7150 and 7250 Switches require any maintenance support(1yr, 3yr, 5yr)?
Will the Ruckus ICX 7150 and 7250 Switches need to be 24 or 48 port switches?
Will there be plenty of AC Power outlets to power the two(2) new switches?
Will the existing AC Power outlet circuit(s) support the new AC Power load/Amps from the two(2) new switches?
If not, will there be new AC Power circuits/outlets installed where needed at the High School?
Will the two(2) new switches be replacing the existing switches or be used in conjunction with existing switches?
Will the two(2) new switches be required to be stacked with the existing switches/equipment?
Is there enough RU(Rack Unit) space in the existing relay rack(s) or will a new relay rack be required at the High School?
What size relay rack will be required, if needed?
Does the relay rack need to be anchored with top supports and to the floor?
Is there an existing MGB(Master Ground Bar) at the High School to ground the relay rack(s)/equipment?
Is there any overhead ladder rack(s) to run Data (CAT5/6, Fiber), Power and Grounding Cables at the High School?
Will vertical and horizontal wire management be required in the relay rack(s) at the High School?
Will CAT5e, CAT6, CAT6A or CAT6e be required? Will any specific colors be required?
Will any data or power cabling be required to run thru dropped ceilings, raised floors, firewalls and conduit(s) at the High School?
Will wax cord, zip ties(black or white) or Velcro straps be required to secure ALL cabling in the relay racks, dropped ceilings, raised floors?
Will the existing patch panels at the High School have enough available jacks/ports to add the two(2) new switches?
If theres not enough available jacks/ports in the existing patch panels at the High School, will ETEX be required to provide/add the new patch panel(s)?
If needed, how many and what size new patch panels will be required at the High School?
A: . Will the Ruckus ICX 7150 and 7250 Switches require any design/engineering services? NO
. Will the Ruckus ICX 7150 and 7250 Switches require any maintenance support(1yr, 3yr, 5yr)? If bundled yes
. Will the Ruckus ICX 7150 and 7250 Switches need to be 24 or 48 port switches? 48
. Will there be plenty of AC Power outlets to power the two(2) new switches? YES
. Will the existing AC Power outlet circuit(s) support the new AC Power load/Amps from the two(2) new switches? YES
. If not, will there be new AC Power circuits/outlets installed where needed at the High School? N/A
. Will the two(2) new switches be replacing the existing switches or be used in conjunction with existing switches? Replace and in conjunction
. Will the two(2) new switches be required to be "stacked" with the existing switches/equipment? YES
. Is there enough RU(Rack Unit) space in the existing relay rack(s) or will a new relay rack be required at the High School? YES
. What size relay rack will be required, if needed? N/A
. Does the relay rack need to be anchored with top supports and to the floor? N/A
. Is there an existing MGB(Master Ground Bar) at the High School to ground the relay rack(s)/equipment? YES
. Is there any overhead ladder rack(s) to run Data (CAT5/6, Fiber), Power and Grounding Cables at the High School? N/A
. Will vertical and horizontal wire management be required in the relay rack(s) at the High School? N/A
. Will CAT5e, CAT6, CAT6A or CAT6e be required? Will any specific colors be required? NO
. Will any data or power cabling be required to run thru dropped ceilings, raised floors, firewalls and conduit(s) at the High School? No
. Will wax cord, zip ties(black or white) or Velcro straps be required to secure ALL cabling in the relay racks, dropped ceilings, raised floors? N/A
. Will the existing patch panels at the High School have enough available jacks/ports to add the two(2) new switches? YES
. If there's not enough available jacks/ports in the existing patch panels at the High School, will ETEX be required to provide/add the new patch panel(s)? N/A
. If needed, how many and what size new patch panels will be required at the High School? N/A
Q: Test Q/A Functionality
A: Response to Test - system working.
Q:
Will the Ruckus ICX 7150 and 7250 Switches require any design/engineering services?
Will the Ruckus ICX 7150 and 7250 Switches require any maintenance support(1yr, 3yr, 5yr)?
Will the Ruckus ICX 7150 and 7250 Switches need to be 24 or 48 port switches?
Will there be plenty of AC Power outlets to power the two(2) new switches?
Will the existing AC Power outlet circuit(s) support the new AC Power load/Amps from the two(2) new switches?
If not, will there be new AC Power circuits/outlets installed where needed at the High School?
Will the two(2) new switches be replacing the existing switches or be used in conjunction with existing switches?
Will the two(2) new switches be required to be stacked with the existing switches/equipment?
Is there enough RU(Rack Unit) space in the existing relay rack(s) or will a new relay rack be required at the High School?
What size relay rack will be required, if needed?
Does the relay rack need to be anchored with top supports and to the floor?
Is there an existing MGB(Master Ground Bar) at the High School to ground the relay rack(s)/equipment?
Is there any overhead ladder rack(s) to run Data (CAT5/6, Fiber), Power and Grounding Cables at the High School?
Will vertical and horizontal wire management be required in the relay rack(s) at the High School?
Will CAT5e, CAT6, CAT6A or CAT6e be required? Will any specific colors be required?
Will any data or power cabling be required to run thru dropped ceilings, raised floors, firewalls and conduit(s) at the High School?
Will wax cord, zip ties(black or white) or Velcro straps be required to secure ALL cabling in the relay racks, dropped ceilings, raised floors?
Will the existing patch panels at the High School have enough available jacks/ports to add the two(2) new switches?
If theres not enough available jacks/ports in the existing patch panels at the High School, will ETEX be required to provide/add the new patch panel(s)?
If needed, how many and what size new patch panels will be required at the High School?
A: . Will the Ruckus ICX 7150 and 7250 Switches require any design/engineering services? NO
. Will the Ruckus ICX 7150 and 7250 Switches require any maintenance support(1yr, 3yr, 5yr)? If bundled yes
. Will the Ruckus ICX 7150 and 7250 Switches need to be 24 or 48 port switches? 48
. Will there be plenty of AC Power outlets to power the two(2) new switches? YES
. Will the existing AC Power outlet circuit(s) support the new AC Power load/Amps from the two(2) new switches? YES
. If not, will there be new AC Power circuits/outlets installed where needed at the High School? N/A
. Will the two(2) new switches be replacing the existing switches or be used in conjunction with existing switches? Replace and in conjunction
. Will the two(2) new switches be required to be "stacked" with the existing switches/equipment? YES
. Is there enough RU(Rack Unit) space in the existing relay rack(s) or will a new relay rack be required at the High School? YES
. What size relay rack will be required, if needed? N/A
. Does the relay rack need to be anchored with top supports and to the floor? N/A
. Is there an existing MGB(Master Ground Bar) at the High School to ground the relay rack(s)/equipment? YES
. Is there any overhead ladder rack(s) to run Data (CAT5/6, Fiber), Power and Grounding Cables at the High School? N/A
. Will vertical and horizontal wire management be required in the relay rack(s) at the High School? N/A
. Will CAT5e, CAT6, CAT6A or CAT6e be required? Will any specific colors be required? NO
. Will any data or power cabling be required to run thru dropped ceilings, raised floors, firewalls and conduit(s) at the High School? No
. Will wax cord, zip ties(black or white) or Velcro straps be required to secure ALL cabling in the relay racks, dropped ceilings, raised floors? N/A
. Will the existing patch panels at the High School have enough available jacks/ports to add the two(2) new switches? YES
. If there's not enough available jacks/ports in the existing patch panels at the High School, will ETEX be required to provide/add the new patch panel(s)? N/A
. If needed, how many and what size new patch panels will be required at the High School? N/A
Q: Etex intends to respond.
A: Thanks for your interest.