The Question/Answer period for this bid has expired.


Questions already answered for this Invitation to Bid will show below.


Q: Cynergy intends to respond
A: Thanks for your interest.

Q: • Will the Ruckus ICX 7150 and 7250 Switches require any design/engineering services? • Will the Ruckus ICX 7150 and 7250 Switches require any maintenance support(1yr, 3yr, 5yr)? • Will the Ruckus ICX 7150 and 7250 Switches need to be 24 or 48 port switches? • Will there be plenty of AC Power outlets to power the two(2) new switches? • Will the existing AC Power outlet circuit(s) support the new AC Power load/Amps from the two(2) new switches? • If not, will there be new AC Power circuits/outlets installed where needed at the High School? • Will the two(2) new switches be replacing the existing switches or be used in conjunction with existing switches? • Will the two(2) new switches be required to be “stacked” with the existing switches/equipment? • Is there enough RU(Rack Unit) space in the existing relay rack(s) or will a new relay rack be required at the High School? • What size relay rack will be required, if needed? • Does the relay rack need to be anchored with top supports and to the floor? • Is there an existing MGB(Master Ground Bar) at the High School to ground the relay rack(s)/equipment? • Is there any overhead ladder rack(s) to run Data (CAT5/6, Fiber), Power and Grounding Cables at the High School? • Will vertical and horizontal wire management be required in the relay rack(s) at the High School? • Will CAT5e, CAT6, CAT6A or CAT6e be required? Will any specific colors be required? • Will any data or power cabling be required to run thru dropped ceilings, raised floors, firewalls and conduit(s) at the High School? • Will wax cord, zip ties(black or white) or Velcro straps be required to secure ALL cabling in the relay racks, dropped ceilings, raised floors? • Will the existing patch panels at the High School have enough available jacks/ports to add the two(2) new switches? • If there’s not enough available jacks/ports in the existing patch panels at the High School, will ETEX be required to provide/add the new patch panel(s)? • If needed, how many and what size new patch panels will be required at the High School?
A: . Will the Ruckus ICX 7150 and 7250 Switches require any design/engineering services? NO . Will the Ruckus ICX 7150 and 7250 Switches require any maintenance support(1yr, 3yr, 5yr)? If bundled yes . Will the Ruckus ICX 7150 and 7250 Switches need to be 24 or 48 port switches? 48 . Will there be plenty of AC Power outlets to power the two(2) new switches? YES . Will the existing AC Power outlet circuit(s) support the new AC Power load/Amps from the two(2) new switches? YES . If not, will there be new AC Power circuits/outlets installed where needed at the High School? N/A . Will the two(2) new switches be replacing the existing switches or be used in conjunction with existing switches? Replace and in conjunction . Will the two(2) new switches be required to be "stacked" with the existing switches/equipment? YES . Is there enough RU(Rack Unit) space in the existing relay rack(s) or will a new relay rack be required at the High School? YES . What size relay rack will be required, if needed? N/A . Does the relay rack need to be anchored with top supports and to the floor? N/A . Is there an existing MGB(Master Ground Bar) at the High School to ground the relay rack(s)/equipment? YES . Is there any overhead ladder rack(s) to run Data (CAT5/6, Fiber), Power and Grounding Cables at the High School? N/A . Will vertical and horizontal wire management be required in the relay rack(s) at the High School? N/A . Will CAT5e, CAT6, CAT6A or CAT6e be required? Will any specific colors be required? NO . Will any data or power cabling be required to run thru dropped ceilings, raised floors, firewalls and conduit(s) at the High School? No . Will wax cord, zip ties(black or white) or Velcro straps be required to secure ALL cabling in the relay racks, dropped ceilings, raised floors? N/A . Will the existing patch panels at the High School have enough available jacks/ports to add the two(2) new switches? YES . If there's not enough available jacks/ports in the existing patch panels at the High School, will ETEX be required to provide/add the new patch panel(s)? N/A . If needed, how many and what size new patch panels will be required at the High School? N/A

Q: Test Q/A Functionality
A: Response to Test - system working.

Q: • Will the Ruckus ICX 7150 and 7250 Switches require any design/engineering services? • Will the Ruckus ICX 7150 and 7250 Switches require any maintenance support(1yr, 3yr, 5yr)? • Will the Ruckus ICX 7150 and 7250 Switches need to be 24 or 48 port switches? • Will there be plenty of AC Power outlets to power the two(2) new switches? • Will the existing AC Power outlet circuit(s) support the new AC Power load/Amps from the two(2) new switches? • If not, will there be new AC Power circuits/outlets installed where needed at the High School? • Will the two(2) new switches be replacing the existing switches or be used in conjunction with existing switches? • Will the two(2) new switches be required to be “stacked” with the existing switches/equipment? • Is there enough RU(Rack Unit) space in the existing relay rack(s) or will a new relay rack be required at the High School? • What size relay rack will be required, if needed? • Does the relay rack need to be anchored with top supports and to the floor? • Is there an existing MGB(Master Ground Bar) at the High School to ground the relay rack(s)/equipment? • Is there any overhead ladder rack(s) to run Data (CAT5/6, Fiber), Power and Grounding Cables at the High School? • Will vertical and horizontal wire management be required in the relay rack(s) at the High School? • Will CAT5e, CAT6, CAT6A or CAT6e be required? Will any specific colors be required? • Will any data or power cabling be required to run thru dropped ceilings, raised floors, firewalls and conduit(s) at the High School? • Will wax cord, zip ties(black or white) or Velcro straps be required to secure ALL cabling in the relay racks, dropped ceilings, raised floors? • Will the existing patch panels at the High School have enough available jacks/ports to add the two(2) new switches? • If there’s not enough available jacks/ports in the existing patch panels at the High School, will ETEX be required to provide/add the new patch panel(s)? • If needed, how many and what size new patch panels will be required at the High School?
A: . Will the Ruckus ICX 7150 and 7250 Switches require any design/engineering services? NO . Will the Ruckus ICX 7150 and 7250 Switches require any maintenance support(1yr, 3yr, 5yr)? If bundled yes . Will the Ruckus ICX 7150 and 7250 Switches need to be 24 or 48 port switches? 48 . Will there be plenty of AC Power outlets to power the two(2) new switches? YES . Will the existing AC Power outlet circuit(s) support the new AC Power load/Amps from the two(2) new switches? YES . If not, will there be new AC Power circuits/outlets installed where needed at the High School? N/A . Will the two(2) new switches be replacing the existing switches or be used in conjunction with existing switches? Replace and in conjunction . Will the two(2) new switches be required to be "stacked" with the existing switches/equipment? YES . Is there enough RU(Rack Unit) space in the existing relay rack(s) or will a new relay rack be required at the High School? YES . What size relay rack will be required, if needed? N/A . Does the relay rack need to be anchored with top supports and to the floor? N/A . Is there an existing MGB(Master Ground Bar) at the High School to ground the relay rack(s)/equipment? YES . Is there any overhead ladder rack(s) to run Data (CAT5/6, Fiber), Power and Grounding Cables at the High School? N/A . Will vertical and horizontal wire management be required in the relay rack(s) at the High School? N/A . Will CAT5e, CAT6, CAT6A or CAT6e be required? Will any specific colors be required? NO . Will any data or power cabling be required to run thru dropped ceilings, raised floors, firewalls and conduit(s) at the High School? No . Will wax cord, zip ties(black or white) or Velcro straps be required to secure ALL cabling in the relay racks, dropped ceilings, raised floors? N/A . Will the existing patch panels at the High School have enough available jacks/ports to add the two(2) new switches? YES . If there's not enough available jacks/ports in the existing patch panels at the High School, will ETEX be required to provide/add the new patch panel(s)? N/A . If needed, how many and what size new patch panels will be required at the High School? N/A

Q: Etex intends to respond.
A: Thanks for your interest.